How design and pre-construction works
From the $350 design visit to a fixed price and a written schedule: the steps, the fees, and how both are credited when you build.
Before we build anything, we design it, price it and put it on a calendar. You see the fixed price and the schedule in writing before you sign the construction agreement. Both early fees are credited when you go ahead.
The steps
- Design visit ($350)
90 minutes at your property with Amara Nwosu, our design lead. You get a written scope note within 3 working days. The $350 is credited in full against a signed Design & Pre-construction agreement. - Design & Pre-construction (from $4,800)
Measured drawings, the design to your approval (two revision rounds), the permit set, and selections at our showroom. - Your fixed price and calendar
Owen Pruitt, our director of pre-construction, prices every line and writes the build schedule week by week. - The construction agreement
One fixed price, the schedule, the four draws and the late-day credit, all in writing. The $4,800 is credited in full when you sign within 60 days.
How long it takes
| Project | Pre-construction, typical |
|---|---|
| Kitchen or bath | 4 to 6 weeks |
| Basement finish | 4 to 6 weeks |
| Addition or second story | 8 to 12 weeks, including the permit review |
| Commercial fit-out | Set to your lease and opening date |
Permit review time depends on the building department, not on us. We tell you the current wait when we file.
Who owns the drawings
Your Design & Pre-construction agreement says who owns the drawings and how you may use them if you do not build with us.